NIT No: WBREDA/NIT- 01/2017-18 Dated. 16/05/2017

NIT for “Design, supply, installation, testing and commissioning of 2X1.5kWp Solar PV Power Plant with battery backup including 5 years comprehensive maintenance at Garalgacha & Bajirhati Public Library, in Hooghly District, West Bengal on turnkey Basis”.

To see the complete NIeT



Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]

  • Copyright © 2024. WBREDA. All Rights Reserved.
    Powered by: Webel Technology Ltd.