You’re invited to a Teams meeting!

You’re invited to a Teams meeting! https://teams.live.com/meet/95306065246589 Meeting Time : 3 pm Date: 19.10.2021
Pre-Bid meeting of 990 nos X 10 kWp GRTSPV Power Plant to be installed throughout West Bengal.

Tap on the link or paste it into a browser to join.



Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]

  • Copyright © 2024. WBREDA. All Rights Reserved.
    Powered by: Webel Technology Ltd.