Rabi Rashmi Housing Complex

WBREDA has completed construction work for the 1st Building Integrated PV Project in the country at New Town area of Kolkata. The project comprises of construction of 25 Nos. of houses with Building Integrated PV of capacity 2.1 kW in each house. In addition to the individual house, a Community Centre has also been constructed in the Housing Complex, where 8 kW Building Integrated PV has been installed. WBREDA has handed over all those buildings to the owners. Registration process of Rabi Rashmi Abasan is started.  Each bungalow has 100 LPD Solar Hot Water System. The bungalows are also under passive architecture to reduce the energy consumption.

Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]

  • Copyright © 2024. WBREDA. All Rights Reserved.
    Powered by: Webel Technology Ltd.