NIT No: WBREDA/NIT- 01/2017-18 Dated. 16/05/2017

NIT for “Design, supply, installation, testing and commissioning of 2X1.5kWp Solar PV Power Plant with battery backup including 5 years comprehensive maintenance at Garalgacha & Bajirhati Public Library, in Hooghly District, West Bengal on turnkey Basis”. To see the complete … Continue reading

| Leave a comment

Notice for cancellation of tender vide No. WBREDA/NIT-01/16-17 dt. 21.12.2016

| Leave a comment

NIT No: WBGEDCL/WBREDA/NIeT- 11 /16-17 dt. 01-03-17

NIT for “Design & engineering, manufacture / procurement, testing, supply, installation and commissioning ETC based Solar Water Heating Systems each of collector capacity 300 and 500LPD of cumulative collector capacity 31100 LPD including five (05) years guarantee and comprehensive maintenance … Continue reading

| Leave a comment

NIT No: WBGEDCL/WBREDA/NIeT-10/16-17 dt. 06-02-17

NIeT for “Design & Engineering, Manufacture / Procurement, Testing, Supply, Installation and Commissioning of 1000 nos. Rooftop Grid Connected Solar PV Power Plants each of array capacity 10 kWp including five (5) years Comprehensive Maintenance on turnkey Basis at various … Continue reading

| Leave a comment

Cancelation of Tender -Ref: No. WBREDA/129(2016)/939 Dated: 06-02-17

To see the complete notification

| Leave a comment

NIT No: WBGEDCL/WBREDA/NIeT-09/16-17 Dated:18-01-17

NIT for “Engineering & Interior works including Modular office, civil and sanitary, plumbing work etc. for providing office accommodation at 2nd floor of WBREDA office, Bikalpa Sakti Bhaban, J-1/10 , EP & GP Block, Sector-V, Salt Lake City, Kolkata-91” To … Continue reading

| Leave a comment

Notification no. WBREDA/738-Part-ll/SRIEL/437

Click on image for detail info:

| Leave a comment

Notification no. WBREDA/738-Part-ll/RP/548

Click on image for detail info:

| Leave a comment

Notification no. WBREDA/738-Part-ll/438

Click on image for detail info:

| Leave a comment

NIT No: WBGEDCL/WBREDA/NIeT- 08 /16-17 dt. 27-12-16

NIT for “Design & Engineering,   Manufacture / Procurement, Testing, Supply,   Installation and Commissioning of 1000 nos. Rooftop Grid Connected Solar PV Power Plants each of array capacity 10 kWp including five (5) years Comprehensive Maintenance on turnkey Basis at various … Continue reading

| Leave a comment

Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]

  • Copyright © 2024. WBREDA. All Rights Reserved.
    Powered by: Webel Technology Ltd.