NIT No: WBGEDCL/WBREDA/NIeT- 11 /16-17 dt. 01-03-17

NIT for “Design & engineering, manufacture / procurement, testing, supply, installation and commissioning ETC based Solar Water Heating Systems each of collector capacity 300 and 500LPD of cumulative collector capacity 31100 LPD including five (05) years guarantee and comprehensive maintenance on turnkey basis at different Govt. Homes and Hostels in West Bengal”.

To see the complete NIeT



Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]

  • Copyright © 2024. WBREDA. All Rights Reserved.
    Powered by: Webel Technology Ltd.