Supply, delivery, fitting and fixing of 12V, 180 AH automotive flat plate type lead acid battery at Chhotomollakhali Biomass Gasifier Power Plant under Gosaba, South 24 Parganas, West Bengal

Please click here for download the tender.



Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]

  • Copyright © 2024. WBREDA. All Rights Reserved.