NIeT No: WBGEDCL/WBREDA/NIeT- 02 /16-17 dated:16-05-16

Design & Engineering,   Manufacture / Procurement, Testing, Supply,   Installation and Commissioning   of a Rooftop  Grid connected Solar PV Power Plant of array capacity 50 kWp including five (5) years Comprehensive Maintenance on turnkey basis at West Bengal Judicial Academy at Rajarhat New Town,West Bengal.

Please click here to download the E-Tender Notice.



Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]