Employment Notification No.: 2/2018 dt. 01.06.2018

Walk-in-Interview for 01 Post of Consultant (IT): 26th June 2018 at 11.30 A.M. at BIKALPA SHAKTI BHAVAN, Plot-J1/10, Block-EP & GP, Sector V, Salt Lake City, Kolkata-700091.

Please click here to download the entire Employment Notice.

 



Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]

  • Copyright © 2024. WBREDA. All Rights Reserved.
    Powered by: Webel Technology Ltd.