  • Recent Development
  • The power demand in Sagar Island is, at present, met from Solar PV Power of aggregate capacity about 250 kW and from a diesel generator power system of capacity 400 kW. The total number of consumer in Sagar Island is to the tune of 1500 now.

    However, there are a large number of prospective consumers, who are awaiting for electric power.Under such circumstances,WBREDA has decided to set up a Wind-Diesel Hybrid power Plant of capacity 500 kW to cater the need of the Island people. [ more ]